Regroup the flat status list into milestones with a 'what this proves' goal, and
tag every item with its §2 side (state/text/both), dependencies, and milestone
goal. Sequencing calls locked: M3 leads with the playable dungeon
(Adjudicator→Combat→Luck) before the comedic roles (Improviser/Banter); streaming
deferred until the M2 dialogue experiment proves aliveness.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Plan status → COMPLETE, all 8 tasks/44 steps checked. Roadmap: Narrator pipeline
✅, Client HTTP loop promoted to ▶ next.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>